Table of Contents

LINT and CDC in VLSI: Ensuring Robust Design and Verification

This article explains the importance of LINT and CDC in VLSI design and verification. LINT is a process that checks the quality of the HDL code, while CDC is a process that verifies the signals crossing different clock domains. Both LINT and CDC aim to ensure robust design and prevent errors or failures in semiconductor devices.

In the field of Very Large-Scale Integration (VLSI), design and verification are critical stages that determine the functionality and reliability of semiconductor devices. LINT (Logical Integrity) and CDC (Clock Domain Crossing) are two essential processes that play a pivotal role in the VLSI design flow. LINT involves static code analysis to ensure the quality of the Hardware Description Language (HDL) code, while CDC focuses on the verification of signals transitioning between different clock domains. 

Understanding LINT in VLSI Design 

LINT is a process that checks the HDL code, such as Verilog or VHDL, for potential design issues, inconsistencies, and coding violations before the simulation phase. This static code analysis tool is crucial for producing clean and error-free RTL (Register-Transfer Level) code  that helps prevent functional errors, timing violations, and design flaws that could otherwise go undetected during simulation. By catching these problems early in the design cycle, LINT saves valuable time and resources in the back-end stages of the ASIC (Application-Specific Integrated Circuit) design process. 

The Role of CDC in VLSI 

CDC verification is concerned with ensuring that data signals can safely pass from one clock domain to another without causing metastability or data coherency issues. As design sizes grow and the number of asynchronous clocks increases, CDC verification becomes more complex and critical. Incorrect handling of asynchronous boundaries can lead to multiple design defects, including metastability, glitches, and loss of data coherency. 

LINT and CDC Tools and Techniques 

Several tools and techniques are employed in the industry to perform LINT and CDC checks effectively. For LINT, tools like Spyglass from Synopsys, Gasper Gold from Cadence, and Alint Pro from Aldec are commonly used. These tools apply thousands of guidelines based on good coding practices and flag any violations for review. 

For CDC, methodologies have been developed to handle the verification signoff of large system-on-chip (SoC) designs. Techniques such as multi-flop synchronizers, FIFOs, and handshake protocols are used to control asynchronous boundaries and ensure data integrity. 

Linting Process in VLSI Design 

Preparing the Code 

Before initiating the lint analysis, it is crucial to ensure that the HDL code is well-prepared. This involves organizing and cleaning the code, removing unnecessary comments, and ensuring that the code is syntactically correct. Proper preparation helps the linting tool to perform a more accurate and efficient analysis. 

Configuring the Linting Instrument 

The next step involves configuring the linting tool to suit the specific requirements of the project. This includes setting up the rules and guidelines that the tool will use to check the code. These settings can vary based on the design standards and the specific needs of the project. 

Executing the Lint Analysis 

Once the configuration is complete, the lint analysis is executed. The tool scans the HDL code thoroughly, checking for any potential issues such as coding errors, inconsistencies, and violations of design guidelines. 

Generating Linting Summaries 

After the analysis is complete, the tool generates a detailed report summarizing the findings. This report includes a list of all detected issues, categorized based on their severity and type. It provides a comprehensive overview of the code’s quality. 

Resolving Detected Issues 

The final step in the linting process is to address the issues identified in the report. Designers review the flagged items and make necessary corrections to rectify any problems. This iterative process ensures that the HDL code is clean, robust, and ready for subsequent stages of the VLSI design flow. 

LINT Report 

Detailed Analysis of LINT Report 

The lint report analysis reveals various design infractions. Key issues include: 

Loops within Combinational Logic 

Loops in combinational logic can create feedback loops that cause indefinite propagation delays, leading to glitches and timing errors. Identifying and breaking these loops is crucial for reliable circuit performance. 

Inferred Latches 

Inferred latches occur when the HDL code implies storage elements unintentionally, often due to incomplete conditional statements. Latches can introduce unwanted memory behavior and timing issues, necessitating careful review and correction of the design. 

Signals Driven by Multiple Sources 

Signals driven by multiple sources can cause contention on the bus, leading to unpredictable circuit behavior. Ensuring that each signal has a single, clear driver helps maintain signal integrity and system reliability. 

Discrepancies in Signal Widths 

Mismatch in signal widths, where signals of different bit-widths are connected, can lead to data loss or overflow. Proper alignment and matching of signal widths ensure accurate data transfer. 

Inputs Lacking Driving Signals 

Inputs without driving signals can float, resulting in undefined logic levels and erratic behavior. All inputs should be adequately driven to maintain consistent and predictable circuit operation. 

Nets that Remain Undriven 

Undriven nets are unused or unconnected wires that can pick up noise, causing spurious signals. Identifying and terminating these nets help avoid unintended interference in the circuit. 

Key Violations to Monitor 

Inferred Latches 

Inferred latches present a significant challenge that can lead to design malfunctions. This issue arises when Verilog code fails to specify a variable’s value at certain times, often due to the incomplete application of specific constructs. For instance: 

An if condition lacking an accompanying else block 

always @ (posedge clk) 

if (a > b) 

c <= a; 

In the example provided, it’s unclear what action is taken regarding c when the condition a > b is not met. In such cases, inferred latches occur, where the tool assumes the variable retains its previous value under these undefined conditions. This can lead to unpredictable behaviour in the design if not addressed properly. 

MULTI-DRIVEN SIGNALS 

In Verilog, signals that are driven by more than one source at the same time are considered multi-driven and are not allowed. This situation leads to signals becoming multi-driven, resulting in unwanted outputs. Typically, in simulations, this will cause the signal to enter an indeterminate ‘don’t care’ (x) state, which can lead to unpredictable behavior and simulation mismatches. It’s crucial to ensure that each signal is driven by a single source to maintain the integrity of the design. 

COMBINATIONAL LOOPS 

Combinational loops are prohibited in Verilog due to their potential to create infinite loops that execute at zero simulation time. Consider the following snippet as an example: 

   always @(*) 

a = a & b; 

This code performs an AND operation between a and b, assigning the result back to a. However, without proper handling, this forms a combinational loop. To execute such an operation correctly, non-blocking assignments should be used to prevent the creation of a loop, ensuring the design’s proper functionality. 

Waiver File 

It may be necessary to add waivers in a waiver file to dismiss specific infractions. Some examples include: 

  • Non-Tristate signals present in pads
  • Variables that are declared but remain unused
  • Inputs that are declared but not utilized
  • Instance input ports that lack connections

Conclusion 

LINT and CDC are indispensable in the VLSI design and verification process. They help in identifying and rectifying potential issues early in the design cycle, leading to more reliable and robust semiconductor devices. As technology advances, the complexity of these processes will continue to increase, making the role of LINT and CDC even more significant in the VLSI industry. 

References

[1] blog on LINT 
[2] LINT 
[3] Lint and CDC – VLSI Guru 
[4] Clock Domain Crossing (CDC) – Semiconductor Engineering 
Picture of Pankaj Singh

Pankaj Singh

Working as a DFT Engineer with 2.5 years of experience, I have been involved in various DFT projects, specifically focusing on 5nm technology, for esteemed clients such as Broadcom and Microsoft.

Explore More

Talk to an Expert

Subscribe
to our Newsletter
Stay in the loop! Sign up for our newsletter & stay updated with the latest trends in technology and innovation.

Start a conversation today

Schedule a 30-minute consultation with our Industrial & Energy Solutions Experts

Start a conversation today

Schedule a 30-minute consultation with our Automotive Industry Experts

Start a conversation today

Schedule a 30-minute consultation with our experts

Please Fill Below Details and Get Sample Report

Reference Designs

Our Work

Innovate

Transform.

Scale

Partnerships

Device Partnerships
Digital Partnerships
Quality Partnerships
Silicon Partnerships

Company

Products & IPs